Modular
Robust systems designed for remote and demanding conditions, with efficient construction, installation and removal.
How it works
Modular, scalable and redeployable systems make renewable energy practical for remote operations, with commercial terms that fit the project.
Explore your options
Model off-grid or grid-connected sites from 100 kW to 100 MW. Set your location, load profile and renewable target to compare generation, storage and indicative costs.
Built on Nomadic's standard cost and resource assumptions. Custom locations use NASA POWER satellite climatology, calibrated to our WA benchmark yields; postcode locations are from GeoNames (CC BY). Grid sites are modelled behind the meter with zero export on the usage rate entered. The full register is available on request via info@nomadic-energy.com.
The $/MWh shown is an indicative all-in cost of power (capital, O&M and fuel) and is not a Nomadic PPA rate or quotation; PPA pricing reflects term, credit and site specifics. Under a Nomadic build-own-operate PPA we fund, build and run the system on your site and you simply buy the energy; the energy and carbon savings shown here are the basis of that offer. A short site assessment turns this into a firm PPA price on measured load and irradiance data.

Robust systems designed for remote and demanding conditions, with efficient construction, installation and removal.
Infrastructure can move between projects over its useful life, supporting flexible agreement terms and cost-effective pricing.
Generation capacity, solar contribution and battery storage can be matched to the size and requirements of your operation.
Operating data supports remote performance monitoring, system diagnostics and ongoing optimisation.
A long-term partnership
Renewable integration can happen in stages.
We can begin with a smaller solar installation alongside existing generation, then work with you to increase the renewable contribution and assess battery storage as your needs develop.
Redeployable infrastructure helps align an asset’s useful life with successive projects, rather than tying its economics to a single site.
See the staged Carosue Dam developmentStart a conversation