Solar projects.

Solar generation at Northern Star’s Carosue Dam operation in Western Australia, delivered across three stages.

6.3 MW

Total site solar capacity

10,480 MWh

Expected annual generation

6,686 t CO₂e

Anticipated annual emissions abatement

Total site capacity following the 2.0 MW expansion. Generation and emissions figures are the original project forecasts.

Carosue Dam

2.0 MW expansion

A 2.0 MW expansion increased the 3.3 MW solar farm to 5.3 MW, bringing total solar capacity across the site to 6.3 MW.

Expected annual generation
3,257 MWh
Anticipated annual CO₂ abatement
2,073 t CO₂e

Figures above relate to the 2.0 MW expansion only.

Carosue Dam

3.3 MW solar development

A 3.3 MW solar installation supplying renewable energy alongside the existing site generation.

Expected annual generation
5,576 MWh
Anticipated annual CO₂ abatement
3,548 t CO₂e

Carosue Dam

1.0 MW solar installation

A 1 MW solar installation integrated with the existing power supply at Carosue Dam.

Expected annual generation
1,647 MWh
Anticipated annual CO₂ abatement
1,065 t CO₂e

Carosue Dam · In operation

Solar performance.

Through yesterdayLoading dates…

Solar energy generated

— MWh

Estimated carbon savings

— t CO₂e

Average daily generation

— MWh/day

Loading generation data…

Metered data · Completed days · Site time (AWST)

Start a conversation